Québec

Lake St-Pierre (2006-2018)

  • Geophysical survey of more than 700 ha of seabed;
  • Removal or destruction of more than 2000 UXO between 0-75 cm depth in sediments; Protective measure construction (bunker) for neutralizing UXO;
  • Neutralization of more than 800 UXOs; and
  • Geophysical record of confirmation.
Valcartier (2006-2017)*

  • Deep clearance (0-100 cm) over 2.5 ha;
  • Includes clearing the bush of the site;
  • Removal of all ammunition fragments> 5cm;
  • Investigation of more than 3000 anomalies;
  • Locating and marking UXO for destruction;
  • Surface clearing (0-45 cm) over 1.34 ha;
  • Includes removal of dangerous ammunition fragments;
  • Excavation;
  • forest path clearance;
  • Tree cutting and shredding on an area 330 ha;
  • Geophysical survey; and
  • Avoidance.
Clova (2014-2015)

  • Destruction of explosives lots and explosive accessories (total weight <60,000 kg) on ​​behalf of Dyno Nobel Canada Inc.
Coteau-du-Lac (2014)

  • Following the BEM fire:
  • Disposal of 220,500 kg of fireworks, destroyed on a site in Rivière-à-Pierre; and
  • Treatment and management of more than 500,000 kg of various remnant.
Granby (2012)

  • Clearance of 6800 m2 over a depth of 1 m; and
  • UXO debris extraction (8034 kg) and disposal of it.
Bécancour (2009)

  • Avoidance on drilling sites.

Terre-Neuve-et-Labrador

Goose Bay (2015-2016)

  • Clearance of the bomb drop zone over the air training area.
  • Management and palletizing of over 300 pallets of munition debris totaling more than 300,000 pounds.

Nouvelle-Écosse

Debert (2013)

  • Geophysical survey of 15 ha.
Black Rock (2013)

  • Visual clearance using diver and underwater drone;
  • Recovery of UXO debris; and
  • Tracking of UXO left in place.
Greenwood (2011-2012)

  • Deforestation and geophysical survey of an area of ​​16 ha;
  • Munition discharge site cleaning.
Dartmouth (2008)

  • Assistance and avoidance on construction site historically at risk.
Bedford (2008)

  • Deforestation of (+ 9.5 ha) for surface clearance;
  • Clearance and extraction of UXO and debris; and
  • Avoidance.

Ontario

Wellers bay (2007, 2013-2015, 2017)

  • Aerial survey of the site;
  • Damage risk assessment;
  • Surface detection on the shore of Lake Ontario and Wellers Bay on 7.5 ha;
  • Documentation of the condition of the site;
  • Maintenance of the site by creation and restoration of dune; and
  • Disposal / Destruction of detected UXO.

Kingston (2013)

  • Surface clearance of a 4.75 ha site;
  • Removal of UXO safe to move; and
  • UXO marking requiring on-site demolition.
Borden (2012)

  • Creation of test site for UXO investigation equipment.

Melbourne (2011)

  • Geophysical survey;
  • Investigation; and
  • Management of UXO debris and waste.
Prince Edward County (2008-2010)

  • Clearance of a shoreline of 42 000 m2, at a maximum depth of 15 cm; and
  • UXO identification and destruction. Disposal of waste and debris.

Alberta

Wainwright (2017)

  • Assisted visual clearance over an area of ​​42 km2 in forest land.
Yekau Lake (2007, 2012)

  • Aerial geophysical survey of 375 ha resulting in the recognition of 50 ha as area of ​​interest; Statement of localisation of cultural characteristics;
  • Analysis model development;
  • Investigation of more than 3000 anomalies; and
  • Destruction of ammunition and extraction of debris.

Colombie Britanique

Albert Head (2013)

  • Underwater survey on 35 ha, 0-20 m deep; and
  • Disposal of UXO debris.
Thiepval Channel (2011)

  • Investigation of submerged wreck and ammunition preliminary survey.

Manitoba

Shilo (2013, 2014)

  • Geophysical survey over 7.5 ha by EM;
  • Clearance of sites; and
  • Disposal of debris.
Rivers (2010)

  • Geophysical survey and clearance to facilitate sampling.